★ Tonight's planning session — handoff
Concrete Psalm is locked. Twelve decisions remain. Each one produces a visual artifact deployed to the dashboard. Tomorrow morning the brand is ready for Fredel; the build session executes Wave A→C in the existing Next.js project, deploying to preview.messagestothemasses.org.
The dashboard already has a multi-stream Recording Studio tab (webcam+mic, screen+audio, mic-only) that saves three independent .webm files per stream. Surfacing it here so it doesn't get lost — both sessions get captured, transcribed, and archived to Google Drive.
.webm files download → drop into Google Drive /M2M2/Recordings/2026-05-05-Planning-Session-Tonight/.oliver@legendarypathway.com workspace, each on own laptop.final-lock.html together. Get Fredel's sign-off (or revisions to apply before build starts)./M2M2/Recordings/2026-05-05-Fredel-Planning-Meeting/.Once .webm files are in Drive (or local F: drive), run faster-whisper locally per memory's Whisper mandatory rule. Recommended command (Whisper transcript + diarization):
whisper-faster --model large-v3 --language en \ --output_format srt --output_format txt \ /M2M2/Recordings/2026-05-05-Fredel-Planning-Meeting/*.webm
Resulting .srt + .txt drop into the same folder. Claude can then read the transcript and produce a meeting-summary doc — a build-ready brief from Fredel's words back into the codebase.
Affidavit, Declaration House, Twenty-Five Lines, Field Recording — all eliminated. Concrete Psalm is the foundation for every typography, palette, mark, layout, motion, and photography decision below.
Reconciliation
Oliver's March 2026 Jesko-Jets-derived brand brief and the 28-task W2 plan from the ops dashboard both contain decisions that survive — and decisions that conflict with the locked brand. The session walks through each.
The session structure
Each step asks one question, surfaces options, gives a recommendation, and produces a visual artifact deployed to messagestothemasses.org/dashboard/website-spec/ + lawlesslegend.com/hub/website-spec/. Aim 35–50 turns total. If a step burns more than 5 turns — simplify and move on.
Dashboard deliverables
All deployed to BOTH dashboards. Open in browser as each is rendered — visual approval after every step, not at the end.
| Artifact | What it shows |
|---|---|
| positioning.html | Hero headline + formal positioning + short homepage variant |
| typescale.html | Archivo / Source Serif 4 / Work Sans / Mono specimen — desktop + mobile |
| palette.html | Section backgrounds, buttons (3 states × 3 variants), forms, links, focus rings |
| mark.html | Wordmark, favicon, footer mark, QR treatment, animation frames |
| hero-comparison.html | Documentary still / Seedance storyboard / hybrid — side-by-side + perf notes |
| homepage.html | Full Concrete Psalm homepage mockup, all sections rendered |
| page-architecture.html | Page cards: home/about/sermons/give/shop/contact/legal |
| give.html | Full /give: tier cards, Mission A Kenya, Mission B AI Education, stewardship, legal copy variants |
| sermons.html | Sermon archive mockup — RSS-driven latest, filters, search, timestamps |
| about.html | Founder/leadership/about — governance hierarchy, doctrine posture |
| motion.html | Animated mark, hero reveal, card reveal, globe motion + reduced-motion fallback |
| photo-brief.html | Shot list, crop matrix, missing-image board, Fredel ask list |
| ops.html | Footer/contact/legal data preview + event-tracking map |
| final-lock.html | Build contract — every decision, open risks, build-session first prompt |
Copy-paste prompt
Open a fresh Claude session (so you have full context budget for ~35–50 turns), paste the prompt below, and run it tonight. Each step deploys to the dashboard as it locks. By Step 12 the brand is fully specified and tomorrow's build session is ready.
After tonight
Reference
| Sparring transcript (104KB, 1,293 lines) | 04_Tools/codex/runs/20260505-003844-m2m2-website-planning-spar.utf8.md |
| Concrete Psalm full mockup | messagestothemasses.org/dashboard/brand-options/option-2.html |
| Original 28-task W2 plan | m2m2-planning-2026-05-04.html → Websites tab → W2 |
| Original Jesko brand brief | Project_Website_M2M2/M2M2-BRAND-BRIEF.md |
| Brand options compare (round 3 finalists) | compare-finalists.html |
| This handoff doc (markdown) | 04_Tools/handoff-2026-05-05-m2m2-website-planning-session.md |